Yard end. The plan is to get it closed up.
100_0614cr.jpg
Day 33 – Weekend of July 29 — Eaves, funnel walls, typar
Yard end. The plan is to get it closed up.
100_0614cr.jpg
The slope makes leveling and securing the staging a little tricky.
100_0616cr.jpg
Paul looks out. The Funnel still has temporary flooring. Typar (house wrap) is already installed on some sections of the outside walls.
100_0618cr.jpg
Paul and Peter get into position to do some sheathing.
100_0619cr.jpg
100_0620cr.jpg
A little trimming.
100_0622cr.jpg
Final piece for the house side gets hoisted up.
100_0623cr.jpg
Maneuvered into position.
100_0625cr.jpg
Ready to be secured.
100_0626cr.jpg
The house side is trimmed flush with the roof line. One more piece to go on the driveway side.
100_0627cr.jpg
While clouds move in.
100_0628cr.jpg
Looking down the inside stairway.
100_0630cr.jpg
Paul checks the remaining hole on the driveway side.
100_0631cr.jpg
Last piece on its way up.
100_0633cr.jpg
And positioned.
100_0634cr.jpg
A little adjustment to the staging.
100_0635cr.jpg
Peter uses the nail gun to secure the last piece of sheathing on the yard end.
100_0637cr.jpg
Ready to trim.
100_0638cr.jpg
The final piece of excess sheathing is on its way down.
100_0639cr.jpg
That finishes off the yard end.
100_0640cr.jpg
Saturday ends.
100_0641cr.jpg
Sunday
The eave-end gets adjusted.
100_0642cr.jpg
Then secured.
100_0643cr.jpg
The yard end has first and second floor doors.
100_0644cr.jpg
Time for more Typer.
100_0645cr.jpg
100_0646cr.jpg
Peter secures some support for the eave board.
100_0647cr.jpg
100_0649cr.jpg
Double checking the eave spacing.
100_0650cr.jpg
More Typar goes on.
100_0651cr.jpg
Yard end almost completely covered.
100_0652cr.jpg
Another weekend ends – Paul heads home.
100_0655cr.jpg