Wow! She's way up there. Actually, one of the weekend goals may be done, i.e., finishing the Typar on the yard end.
100_0703cr.jpg
Day 35 – 8/5 through 8/13 — Sheathing and roof trim
Wow! She's way up there. Actually, one of the weekend goals may be done, i.e., finishing the Typar on the yard end.
100_0703cr.jpg
And Peter is ready to go as well.
100_0704cr.jpg
100_0706cr.jpg
Moving on to prepping the garage door jambs. Notches are needed to fit around the concrete on a couple of boards.
100_0709cr.jpg
Things are going well.
100_0712cr.jpg
If the compressor will only stand still.
100_0713cr.jpg
The Plan. Who spilled the coffee?
100_0716cr.jpg
With the jamb installed and plumb the plywood can be finished off.
100_0720cr.jpg
Continuing along. You can never have enough clamps. Did I say that already?
100_0721cr.jpg
100_0722cr.jpg
The cart loaded for action. This little piece of equipment has been used for a variety of tasks and has proven to be very useful throughout the construction process.
100_0724cr.jpg
One of the last pieces of plywood sheathing.
100_0725cr.jpg
It gets nudged into position.
100_0727cr.jpg
And nailed down.
100_0729cr.jpg
Coming to the end.
100_0731cr.jpg
Some careful positioning.
100_0732cr.jpg
Time to move on to trim.
100_0733cr.jpg
100_0734cr.jpg
Peter is trimming the roof sheathing in preparation for trimboard installation.
100_0737cr.jpg
100_0738cr.jpg
Unplugged for the day.
100_0739cr.jpg
End of day - 8/6.
100_0740cr.jpg
August 8
Short day. Getting ready to start Typar on Wolf Run end.
100_0741cr.jpg
Not a lot of work, but a start.
100_0742cr.jpg
August 10
Saw station set up to prep eave end trim boards for installation on the weekend when Paul reappears.
100_0743cr.jpg
Nancy on a trim piece.
100_0744cr.jpg
The give away isn't the date. It's Paul's presence. So preparation to install trim boards continues.
100_0745cr.jpg
Peter and Paul do more prep work on the yard end. A few temporary pieces will provide clamping support for the trim.
100_0751cr.jpg
Clamps, clamps, look at all those clamps (something you can never have enough of - especially when working short handed.)
100_0753cr.jpg
Trim board positioned on the front of the garage.
100_0754cr.jpg
Paul wields the magnet rake. It works so good you would almost think it came from The Fair.
100_0755cr.jpg
Peter and Paul at the yard end peak.
100_0756cr.jpg
5 tiers of staging.
100_0758cr.jpg
Caterpillar enjoys climbing the Typar.
100_0759cr.jpg
Paul lines up the pressure-treated while Pater works the clamp.
100_0761cr.jpg
Time to nail.
100_0762cr.jpg
Paul attaches Typar to Run end.
100_0764cr.jpg
Looks good!
100_0765cr.jpg
Paul trims the Typar.
100_0767cr.jpg
The work has moved to the peak.
100_0768cr.jpg
Close enough...
100_0769cr.jpg
that we can start attaching.
100_0770cr.jpg
100_0771cr.jpg
Paul works the screws down the trim.
100_0772cr.jpg
The function of the temporary pieces attached earlier can be seen here.
100_0773cr.jpg
100_0774cr.jpg
Paul is pouting as he prepares to leave. A rain delay and equipment problem left the Run end not quite finished.
100_0776cr.jpg
But the show must go on so he doesn't get home too late.
100_0777cr.jpg
And away he goes – again.