Wolf Run end.
100_0483cr.jpg
Day 28 – 7/8-7/22 — Funnel and roof
Wolf Run end.
100_0483cr.jpg
Funnel action.
100_0484cr.jpg
This is the Wolf Run end. One of the goals for the weekend is to finish closing it in and trimming the end sheathing to the roof line.
100_0486cr.jpg
Peter is ready for action.
100_0488cr.jpg
100_0490cr.jpg
Sheathing goes on.
100_0493cr.jpg
House side is almost trimmed flush.
100_0494cr.jpg
Peter swings a hammer. Did Flynnie hide the nail gun?
100_0495cr.jpg
Someone inside must have asked Pete about the nail gun.
100_0496cr.jpg
Some support pieces go up on the yard end.
100_0498cr.jpg
Peter and Paul discuss some fine point on the Run end.
100_0499cr.jpg
The gun has been found.
100_0500cr.jpg
Getting close to a closed-up and trimmed Run end.
100_0501cr.jpg
100_0502cr.jpg
Pass up some sheathing.
100_0503cr.jpg
A little trimming.
100_0504cr.jpg
And there we have it.
100_0505cr.jpg
Let's call it a day.
100_0507cr.jpg
Time to start already?
100_0509cr.jpg
Sub-fascia boards are on the menu. Dust masks required for the pressure treated wood.
100_0510cr.jpg
Paul does some prep work.
100_0512cr.jpg
A broken cordless drill gets surgery.
100_0513cr.jpg
Congratulations - no extra parts.
100_0517cr.jpg
Pressure treated goes to eave. The weight makes them a little hard to work with.
100_0518cr.jpg
End piece.
100_0520cr.jpg
Run end.
100_0521cr.jpg
Doing some sample layouts of trim pieces.
100_0522cr.jpg
Carefully measured glue (a glob) holds things together.
100_0523cr.jpg
Step 2.
100_0524cr.jpg
Step 3 – clamp and watch it set.
100_0525cr.jpg
Slip it in place when it's dry.
100_0526cr.jpg
100_0527cr.jpg
And the weekend comes to a close.
100_0529cr.jpg
Peter handles the radio and Paul has his weekend kit.
100_0530cr.jpg
And Paul heads home.
100_0533cr.jpg
7/16 – only workable day this weekend.
Radio tuned, compressor compressing.
100_0534cr.jpg
Peter having some wet fun in the Funnel.
100_0535cr.jpg
A little alignment.
100_0536cr.jpg
The plan for the yard end.
100_0537cr.jpg
Only the finest feather-weight materials are used on second floor end-wall structure.
100_0538cr.jpg
Yard end wall in place.
100_0539cr.jpg
The short weekend comes to an end.
100_0542cr.jpg
Nancy tries to convince us she called time today.
100_0543cr.jpg
100_0544cr.jpg
Bella is still relaxing.
100_0545cr.jpg
Yard end is almost ready for close-up. Some studs to the truss peaks is still needed.
100_0546cr.jpg
And Nick rests.
100_0548cr.jpg
New garage means new places for spiders.
100_0555cr.jpg
Weekend of 7/22 – A rainy weekend.
With one end closed-up and the other almost closed-up it's time to break out the lights.
100_0556cr.jpg
Chopping lumber to complete the top of the yard end wall.
100_0557cr.jpg
Another effect of the close-up – the music has to be moved to the Funnel.
100_0558cr.jpg
The crips are going in above the window headers.
100_0559cr.jpg
Got to keep the Funnel tidy.
100_0560cr.jpg
100_0561cr.jpg
Peter nails a stud.
100_0563cr.jpg
Ready to complete sheathing. A job for a dry weekend.
100_0564cr.jpg