Day 49 – 9/9 – 9/17 — Shingling and skylights go in
100_0886cr.jpg
It's time to cut some of the old tarp away.
100_0887cr.jpg
Shingle raising rig.
100_0888cr.jpg
Peter loads the gun before going into battle.
100_0889cr.jpg
As Nancy double checks the instructions.
100_0890cr.jpg
The new van looks on as the Escort organizes the paperwork.
100_0891cr.jpg
Peter heads for the Funnel.
100_0892cr.jpg
And a skylight follows.
100_0893cr.jpg
A little prep work...
100_0894cr.jpg
...and the skylight is in.
100_0895cr.jpg
100_0896cr.jpg
Time for cover-up.
100_0897cr.jpg
Nick and Bella relax after a hards day work.
100_0898cr.jpg
New day.
100_0900cr.jpg
100_0901cr.jpg
100_0902cr.jpg
100_0903cr.jpg
100_0904cr.jpg
100_0905cr.jpg
100_0906cr.jpg
100_0907cr.jpg
100_0908cr.jpg
A roll of felt paper goes up.
100_0909cr.jpg
Peter tacks the felt down. The peak is getting close.
100_0910cr.jpg
100_0911cr.jpg
Shingles on the shingle rig ready to be hoisted aloft. The blocks that were purchased to pull plywood sheets up early in the build are still gainfully employed.
100_0912cr.jpg
100_0913cr.jpg
100_0915cr.jpg
Shingles coming up!
100_0916cr.jpg
100_0917cr.jpg
Heave-ho.
100_0918cr.jpg
100_0919cr.jpg
Peter does some layout work.
100_0920cr.jpg
Shingles are past the skylights.
100_0921cr.jpg
100_0922cr.jpg
More scaffolding, to take it above the peak, goes up.
100_0923cr.jpg
100_0924cr.jpg
100_0925cr.jpg
More scaffolding goes on in preparation for the assault on the peak.
100_0926cr.jpg
100_0927cr.jpg
Screw gun goes up.
100_0930cr.jpg
Felt is on up to the peak on the road side.
100_0931cr.jpg
100_0933cr.jpg